# C3IEL-A
*missions*

## Specifications
- **operator**: cnes
- **entity type**: mission
- **last verified date**: 2026-11-28
- **verified by**: sw
- **claim status**: unclaimed
- **provider**: cnes

## Editorial
C3IEL-A is a planned nanosatellite in the Cluster for Cloud Evolution, ClimatE and Lightning (C3IEL) programme. It is paired with its sister satellite, C3IEL-B [^c3w-a]. C3IEL is designed to study the dynamics of convective clouds, and is a joint mission of the Centre National d'Etudes Spatiales (CNES) and the Israel Space Agency (ISA) [^c3].

## Mission and orbit

C3IEL-A is planned for a 650 km Sun-synchronous orbit with a 13:30 equator-crossing time, and has a planned dry mass of 45 kg [^c3w-a]. The planned mission duration is two to three years [^c3gov][^c3][^c3isa]. In September 2026 the French government gave early 2028 as the launch target [^c3gov][^c3].

For a daylight cloud scene, the mission plans 11 stereoscopic acquisitions at 20-second intervals over 200 seconds. At each acquisition, C3IEL-A and C3IEL-B are to observe the same scene simultaneously from different angles [^c3][^c3isa]. These multi-angle observations are designed to reconstruct the three-dimensional structure of clouds and estimate how fast they grow [^c3].

## Instruments

C3IEL-A is planned to carry three instruments [^c3w-a]:

- The CLOUD visible camera, designed to image the cloud envelope at a resolution of about 20 m [^c3] with a 670 nm channel [^c3egu].
- The Water Vapour Imager, which uses three infrared cameras [^c3isa] and is designed to observe water vapour at 1.04, 1.13 and 1.37 micrometres [^c3egu].
- The Lightning Optical Imagers and Photometers (LOIP) instrument, designed to observe electrical activity in clouds [^c3]. Its lightning imager uses a 777.4 nm channel [^c3egu].

## Partners and responsibilities

CNES is responsible for the spacecraft buses, satellite integration and validation, and the ground processing of geometric corrections, and will operate the two C3IEL spacecraft [^c3]. ISA is responsible for developing the instruments and for radiometric processing [^c3old][^c3gov]. On the Israeli side, ISA leads the mission through the Technion's Asher Space Research Institute [^c3isa].

Hemeria was the French industrial contractor in the 2024 contracting round [^c3gov]. The French laboratories LOA, LAERO and CNRM are research partners in the mission [^c3]. By December 2020 CNES had selected AERIS to operate the French part of the mission's data processing and distribution centre [^c3aeris].

## Supply chain position
- C3IEL-A --[mission_operator]--> cnes (companies)

## Sources
- [space-oscar-wmo-int] | space.oscar.wmo.int | https://space.oscar.wmo.int/satellites | tier=third-party | accessed=2026-10-20
- [c3w-a] | WMO OSCAR C3IEL-A flight candidate record | https://space.oscar.wmo.int/satellites/view/c3iel_a | tier=agency-doc | accessed=2026-11-26
- [c3] | CNES C3IEL mission specifications and schedule | https://cnes.fr/en/projects/c3iel | tier=agency-doc | accessed=2026-11-26
- [c3old] | CNES C3IEL board approval | https://cnes.fr/communiques/approbation-conseil-dadministration-cnes-demarrage-de-mission-c3iel | tier=operator-press | accessed=2026-11-26
- [c3gov] | French government response to parliamentary question 14742, 8 September 2026 | https://questions.assemblee-nationale.fr/q17/17-14742QE.htm | tier=agency-doc | accessed=2026-11-26
- [c3isa] | Israel Space Agency C3IEL mission | https://www.space.gov.il/en/research-and-development/134761 | tier=agency-doc | accessed=2026-11-26
- [c3aeris] | AERIS C3IEL distribution appointment, December 2020 | https://www.aeris-data.fr/en/aeris-partner-in-the-c3iel-mission/ | tier=operator-press | accessed=2026-11-26
- [c3egu] | C3IEL mission-team instrument abstract EGU24-13989 | https://meetingorganizer.copernicus.org/EGU24/EGU24-13989.html | tier=agency-doc | accessed=2026-11-26

---
Source: https://eo-atlas.org/missions/c3iel-a
Publisher: SpectraWorks B.V. (CC-BY 4.0)