EO·Atlas
Preview build / EO·Atlas v0.9, content still landing
missions

C3IEL-B

C3IEL-B is a planned nanosatellite in the Cluster for Cloud Evolution, ClimatE and Lightning (C3IEL) programme. It is paired with its sister satellite, C3IEL-A [1]. C3IEL is a joint mission of the Centre National d'Etudes Spatiales (CNES) and the Israel Space Agency (ISA), designed to study the dynamics of convective clouds [2].

Mission and orbit

C3IEL-B is planned for a 650 km Sun-synchronous orbit with a 13:30 equator-crossing time, and has a planned dry mass of 45 kg [1]. The planned mission duration is two to three years [3][2][4]. In September 2026 the French government gave early 2028 as the launch target [3][2].

For a daylight cloud scene, the mission plans 11 stereoscopic acquisitions at 20-second intervals over 200 seconds. At each acquisition, C3IEL-A and C3IEL-B are to observe the same scene simultaneously from different angles [2][4]. These multi-angle observations are designed to reconstruct the three-dimensional structure of clouds and estimate how fast they grow [2].

Instruments

C3IEL-B is planned to carry three instruments [1]:

  • The CLOUD visible camera, designed to image the cloud envelope at a resolution of about 20 m [2]. It is designed to image at 670 nm [5].
  • The Water Vapour Imager, which uses three infrared cameras [4]. It is designed to observe water vapour at 1.04, 1.13 and 1.37 micrometres [5].
  • The Lightning Optical Imagers and Photometers (LOIP) instrument, designed to observe electrical activity in clouds [2]. Its lightning imager uses a 777.4 nm channel [5].

Partners and responsibilities

CNES is responsible for the spacecraft buses, satellite integration and validation, and the ground processing of geometric corrections, and will operate the two C3IEL spacecraft [2]. ISA is responsible for developing the instruments and for radiometric processing [6][3]. On the Israeli side, ISA leads the mission through the Technion's Asher Space Research Institute [4].

Hemeria was the French industrial contractor in the 2024 contracting round [3]. LOA, LAERO and CNRM are French research partners in the mission [2]. By December 2020 CNES had selected AERIS to operate the French part of the mission's data processing and distribution centre [7].

Supply chain position

Sources
Cite https://eo-atlas.org/missions/c3iel-b Markdown twin → Field definitions → Suggest a correction →
How to cite this page

Plain text

C3IEL-B. EO-Atlas, SpectraWorks B.V. https://eo-atlas.org/missions/c3iel-b (CC BY 4.0)

BibTeX

@misc{eoatlas:missions:c3iel-b,
  title = {C3IEL-B},
  author = {{EO-Atlas}},
  publisher = {SpectraWorks B.V.},
  note = {CC BY 4.0},
  url = {https://eo-atlas.org/missions/c3iel-b}
}