EO·Atlas
Preview build / EO·Atlas v0.9, content still landing
03 Category . 263 entries

Missions

Earth observation satellite missions - in-orbit deployments with launch date, operator, orbit, and operational status. The satellite data products each mission generates are catalogued separately.

Sort
Status
Showing 263 of 263 . sorted A-Z

ADM-Aeolus (Atmospheric Dynamics Mission)

MISSION European Space Agency
Launched 2018-08-22 Orbit LEO sun-synchronous, 320 km
Ended

ALOS-2

MISSION Japan Aerospace Exploration Agency
Launched "2014-05-2 Orbit Sun-synchronous sub-recurrent, 628 km, 97.9 degree inclination, 14-day repeat, 12:00 LTDN Swath 350 km Revisit 14 d
Extended operations

ALOS-4

MISSION Japan Aerospace Exploration Agency
Launched "2024-07-0 Orbit Sun-synchronous sub-recurrent, 628 km, 97.9 degree inclination, 14-day repeat, 12:00 LTDN Swath 700 km Revisit 14 d
Operational

AlSat-1

MISSION Agence Spatiale Algerienne
Launched 2002-11-28 Orbit Sun-synchronous LEO, approximately 700 km Swath 600 km
Ended

AlSat-1B

MISSION Agence Spatiale Algerienne
Launched 2016-09-26 Orbit Sun-synchronous LEO, approximately 700 km Swath 150 km Revisit 7 d
Extended operations

AlSat-1N (AlSat-Nano)

MISSION Agence Spatiale Algerienne
Launched 2016-09-26 Orbit Sun-synchronous LEO
Operational

AlSat-2A

MISSION Agence Spatiale Algerienne
Launched 2010-07-12 Orbit Sun-synchronous orbit, about 670-680 km Swath 17.5 km Revisit 3 d
Extended operations

AlSat-2B

MISSION Agence Spatiale Algerienne
Launched 2016-09-26 Orbit Sun-synchronous orbit, about 670 km Swath 17.5 km Revisit 3 d
Extended operations

ANSER (Advanced Nanosatellites System for Earth Observation Research)

MISSION Instituto Nacional de Tecnica Aeroespacial
Launched 2023-10-09 Orbit Sun-synchronous orbit Swath 50 km Revisit 30 d
Operational

Aqua

MISSION National Aeronautics and Space Administration
Launched "2002-05-0 Orbit Sun-synchronous, originally 705 km / 1:30 PM ascending; in free-drift since December 2021 (altitude descending, crossing time drifting later); inclination 98.2 degrees Swath 2330 km Revisit 1 d
Degraded

Aura

MISSION National Aeronautics and Space Administration
Launched 2004-07-15 Orbit Sun-synchronous near-polar orbit, 705 km altitude, 98.2 degree inclination, approximately 13:45 ascending equator crossing Revisit 16 d
Extended operations

Azersky

MISSION Azercosmos
Launched 2014-06-30 Orbit Sun-synchronous, about 642 x 659 km, 98.26 deg Swath 60 km
Ended

Badr-B

MISSION Space and Upper Atmosphere Research Commission
Launched 2001-12-10 Orbit Sun-synchronous, about 986 x 1014 km, 99.7 deg
Ended

BILSAT-1

MISSION Tubitak Uzay
Launched 2003-09-27 Orbit Sun-synchronous, about 676 x 693 km, 98.20 deg
Ended

BIOMASS

MISSION European Space Agency
Launched "2025-04-2 Orbit Sun-synchronous, 666 km, 97.97 degree inclination, dawn-dusk 06:00 LTAN, 3-day near-repeat, 17-day quasi-repeat Swath 50 km Revisit 3 d
Operational

BlackSky constellation

MISSION BlackSky Technology Inc.
Orbit Low Earth orbit; inclined orbits around 500 km, with 42-53 degree inclination reported for assessed Global satellites Swath 6 km
Operational

CALIPSO (Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations)

MISSION National Aeronautics and Space Administration
Launched 2006-04-28 Orbit LEO sun-synchronous, 685 km, 98.2 deg inclination
Ended

Capella Space SAR constellation

MISSION Capella Space
Launched 2018-12-03 Orbit Commercial SAR constellation; CEOS lists sun-synchronous orbit at about 575 km for Capella X-SAR Revisit 0.25 d
Operational

Cartosat-2A

MISSION Indian Space Research Organisation
Launched 2008-04-28 Orbit Sun-synchronous orbit, 635 km, 09:32 descending equator crossing Swath 9.6 km
Ended

Cartosat-3

MISSION Indian Space Research Organisation
Launched 2019-11-27 Orbit Sun-synchronous LEO, 450-509 km, 97.5-97.9 deg inclination Swath 17 km Revisit 7 d
Operational

CATS ISS deployment

MISSION National Aeronautics and Space Administration
Launched 2015-01-10 Orbit ISS orbit, about 407 km altitude, 51.6 degree inclination, non-sun-synchronous
Ended

CBERS-4

MISSION Instituto Nacional de Pesquisas Espaciais
Launched 2014-12-07 Orbit Sun-synchronous orbit, 778 km altitude, 10:30 local solar time Swath 866 km Revisit 5 d
Extended operations

CBERS-4A

MISSION Instituto Nacional de Pesquisas Espaciais
Launched 2019-12-20 Orbit Sun-synchronous orbit, approximately 629 km altitude, 10:30 local solar time Swath 684 km Revisit 5 d
Extended operations

CFOSAT

MISSION Centre National d'Etudes Spatiales
Launched 2018-10-29 Orbit Sun-synchronous orbit, about 500-519 km altitude, 06:00-07:00 descending equator crossing time
Degraded

CHAMP

MISSION Helmholtz-Zentrum Potsdam GFZ German Research Centre for Geosciences
Planned

CloudSat

MISSION National Aeronautics and Space Administration
Launched 2006-04-28 Orbit Sun-synchronous LEO, about 705 km
Ended

COSMO-SkyMed

MISSION Agenzia Spaziale Italiana
Launched 2007-06-07 Orbit Sun-synchronous dawn-dusk orbit around 06:00 local time; first-generation CSK programme satellites flown in a phased four-satellite constellation Swath 200 km Revisit 0.5 d
Operational

COSMO-SkyMed Second Generation

MISSION Agenzia Spaziale Italiana
Launched 2019-12-18 Orbit Sun-synchronous dawn-dusk orbit at about 620 km altitude and 97.8 degree inclination Swath 200 km Revisit 1.5 d
Operational

CryoSat-2

MISSION European Space Agency
Launched 2010-04-08 Orbit Low-Earth non-sun-synchronous drifting orbit, 717 km altitude, 92 deg inclination
Extended operations

CYGNSS (Cyclone Global Navigation Satellite System)

MISSION National Aeronautics and Space Administration
Launched 2016-12-15 Orbit LEO 520 km, 35 deg inclination (non-SSO) Swath 1480 km
Operational

DESIR

MISSION Loft Orbital
Planned launch "2029-01-0 Orbit LEO, TBD
Planned

DESIS ISS deployment

MISSION Deutsches Zentrum fuer Luft- und Raumfahrt
Launched "2018-06-2 Orbit ISS orbit, approximately 400 km altitude, 51.6 degree inclination, non-sun-synchronous
Ended

Diwata-1 (PHL-Microsat-1)

MISSION Dost Asti
Launched 2016-03-23 Orbit ISS-deployed LEO, approximately 400 km class, 51.6 deg inclination
Ended

Diwata-2

MISSION Dost Asti
Launched 2018-10-29 Orbit Sun-synchronous orbit, approximately 620 km altitude
Operational

DMSat-1

MISSION Dubai Municipality
Launched 2021-03-22 Orbit Sun-synchronous rideshare orbit
Operational

DMSP-F17

MISSION United States Air Force
Planned

DMSP-F18

MISSION United States Space Force
Launched 2009-10-18 Orbit Sun-synchronous near-polar orbit, approximately 830-850 km altitude, 04:30 descending equator crossing Swath 3000 km Revisit 0.58 d
Extended operations

DQ-1 / Daqi-1

MISSION China National Space Administration
Launched 2022-04-16
Operational

DQ-2 / Daqi-2

MISSION China National Space Administration
Launched 2026-04-17 Orbit SSO 705 km
Operational

DSCOVR

MISSION National Oceanic and Atmospheric Administration (NOAA)
Launched 2015-02-11 Orbit Sun-Earth L1 Lagrange point, about 1.5 million km from Earth
Operational

DubaiSat-1

MISSION Mohammed Bin Rashid Space Centre
Launched 2009-07-29 Orbit Sun-synchronous LEO, approximately 666-681 km Swath 20 km
Ended

DubaiSat-2

MISSION Mohammed Bin Rashid Space Centre
Launched 2013-11-21 Orbit Sun-synchronous LEO, approximately 600 km Swath 12.2 km Revisit 8 d
Extended operations

EagleEye

MISSION Polish Space Agency
Launched 2024-08-16 Orbit Very-low/low Earth orbit after SpaceX Transporter-11 deployment
Degraded

EarthCARE (Earth Cloud, Aerosol and Radiation Explorer)

MISSION European Space Agency
Launched 2024-05-28 Orbit LEO sun-synchronous, 393 km, 97.05 deg inclination
Operational

ECOSTRESS ISS deployment

MISSION National Aeronautics and Space Administration
Launched 2018-06-29 Orbit ISS orbit, approximately 400 km altitude, 51.5 degree inclination, non-sun-synchronous Swath 384 km
Extended operations

EgyptSat-1

MISSION National Authority for Remote Sensing and Space Sciences
Launched 2007-04-17 Orbit Sun-synchronous orbit, about 658 x 666 km, 98.1 deg Swath 46.6 km
Ended

EgyptSat-2

MISSION National Authority for Remote Sensing and Space Sciences
Launched 2014-04-16 Orbit Low Earth orbit; launched to about 436 x 703 km, 51.6 deg, later circularised near 720 km Swath 1400 km
Ended

EgyptSat-A

MISSION National Authority for Remote Sensing and Space Sciences
Launched 2019-02-21 Orbit Sun-synchronous orbit, about 660-668 km, about 98 deg Swath 1400 km
Operational

Electro-L N2

MISSION Roshydromet
Launched 2015-12-11 Orbit Geostationary orbit at 14.5 deg W; transferred from 76 deg E in August 2020 Revisit 0.0104 d
Extended operations

Electro-L N3

MISSION Roshydromet
Launched 2019-12-24 Orbit Geostationary orbit, 76 E, 35786 km
Operational

Electro-L N4

MISSION Roshydromet
Launched 2023-02-05 Orbit Geostationary orbit, 165.8 E, 35786 km
Operational

EMIT ISS deployment

MISSION National Aeronautics and Space Administration
Launched "2022-07-1 Orbit ISS orbit, approximately 407 km altitude, 51.6 degree inclination, non-sun-synchronous Swath 80 km
Extended operations

EnMAP

MISSION Deutsches Zentrum fuer Luft- und Raumfahrt
Launched "2022-04-0 Orbit Sun-synchronous, 653 km, 97.96 deg inclination, 11:00 LTDN, 27-day nadir repeat Swath 30 km Revisit 4 d
Operational

EOS SAT-1

MISSION EOS Data Analytics
Launched 2023-01-03 Orbit LEO SSO 540 km, 97.43 deg inclination Swath 22.2 km Revisit 5 d
Operational

EOS-01 (RISAT-2BR2)

MISSION Indian Space Research Organisation
Launched 2020-11-07 Orbit Low Earth drifting orbit, about 555 km altitude and 37 degree inclination Swath 50 km Revisit 5 d
Operational

EOS-04

MISSION Indian Space Research Organisation
Launched 2022-02-14 Orbit Sun-synchronous polar orbit, 529 km
Operational

EROS B

MISSION ImageSat International
Launched 2006-04-25 Orbit Sun-synchronous, ~510 km Swath 7 km
Ended

EROS C3

MISSION ImageSat International
Launched 2022-12-30 Orbit Mid-inclination orbit Swath 12.5 km
Operational

Etihad-SAT

MISSION Mohammed Bin Rashid Space Centre
Launched 2025-03-15 Orbit Low Earth orbit, ~500 km
Operational

Fengyun-2H (FY-2H)

MISSION China Meteorological Administration
Launched 2018-06-05 Orbit Geostationary orbit, 35786 km altitude, 79 deg E longitude
Extended operations

Fengyun-3

MISSION China National Space Administration
Planned

FLEX (FLuorescence EXplorer)

MISSION European Space Agency
Planned launch 2026-09-01 Orbit LEO SSO 815 km Swath 150 km Revisit 27 d
Planned

FORMOSAT-3/COSMIC

MISSION University Corporation for Atmospheric Research (UCAR)
Planned

FORMOSAT-5

MISSION Taiwan Space Agency
Launched 2017-08-24 Orbit Sun-synchronous LEO, about 720 km Swath 24 km Revisit 2 d
Extended operations

FORMOSAT-7/COSMIC-2

MISSION National Oceanic and Atmospheric Administration (NOAA)
Planned

FORMOSAT-8

MISSION Taiwan Space Agency
Launched 2025-11-28 Orbit Sun-synchronous LEO, about 560 km for first deployed satellite Swath 10 km Revisit 1 d
Operational

FY-4A

MISSION China Meteorological Administration
Launched 2016-12-11 Orbit Geostationary orbit, 123.5 E, 35786 km; relocated after 18 February 2025 for full-disc coverage Revisit 0.0104 d
Operational

FY-4B

MISSION China Meteorological Administration
Launched 2021-06-03 Orbit Geostationary orbit, 105 E, 35786 km; WMO records relocation from 133 E to 105 E in February 2024
Operational

Gaofen-1 (GF-1)

MISSION China National Space Administration
Launched 2013-04-26 Orbit Sun-synchronous orbit, 640-644 km altitude, 10:30 descending equator crossing Revisit 41 d
Extended operations

Gaofen-2

MISSION China National Space Administration
Launched 2014-08-19 Orbit Sun-synchronous orbit, about 631 km Swath 45.3 km Revisit 5 d
Extended operations

Gaofen-3 (GF-3)

MISSION China National Space Administration
Launched 2016-08-09 Orbit Sun-synchronous orbit, 758 km altitude, 06:00 descending equator crossing time Swath 650 km Revisit 7 d
Operational

Gaofen-5 (GF-5)

MISSION China National Space Administration
Launched 2018-05-08 Orbit Sun-synchronous orbit, about 705-708 km altitude, 13:30 local time
Ended

Gaofen-6 (GF-6)

MISSION China National Space Administration
Launched 2018-06-02 Orbit Sun-synchronous orbit, about 640-645 km altitude, 10:30 local imaging time Swath 800 km Revisit 41 d
Operational

Gaofen-7 (GF-7)

MISSION China National Space Administration
Launched 2019-11-03 Orbit SSO, 505 km
Operational

GCOM-C (Shikisai)

MISSION Japan Aerospace Exploration Agency
Launched 2017-12-23 Orbit Sun-synchronous orbit, 798 km altitude, 98.6 deg inclination, 10:30 descending local time Swath 1000 km Revisit 2 d
Extended operations

GCOM-W1 (Shizuku)

MISSION Japan Aerospace Exploration Agency
Launched 2012-05-18 Orbit Sun-synchronous, 699.6 km, 98.2 deg inclination, 13:30 LTAN (A-Train) Swath 1450 km Revisit 2 d
Extended operations

GEDI ISS deployment

MISSION National Aeronautics and Space Administration
Launched "2018-12-0 Orbit ISS orbit, about 407 km altitude, 51.6 degree inclination, non-sun-synchronous
Extended operations

GEO-KOMPSAT-2A (GK2A)

MISSION Korea Meteorological Administration
Launched 2018-12-04 Orbit Geostationary orbit, 35786 km altitude, 128.2 deg E longitude
Operational

GEO-KOMPSAT-2B

MISSION Korea Aerospace Research Institute
Launched 2020-02-18 Orbit Geostationary orbit, 35786 km altitude, 128.2 deg E longitude Swath 2500 km Revisit 1 d
Operational

GeoEye-1

MISSION Vantor
Launched "2008-09-0 Orbit Sun-synchronous, 770 km, 98 deg inclination, 10:30 LTDN Swath 15.2 km Revisit 1.7 d
Extended operations

GHGSat constellation

MISSION GHGSat Inc.
Launched 2016-06-22 Orbit Sun-synchronous orbit, approximately 500 km, 97.5 deg inclination Swath 12 km Revisit 1 d
Operational

GOCE

MISSION European Space Agency
Launched 2009-03-17 Orbit Low Earth orbit gravity mission; drag-free operations at about 254 km before lower-orbit campaign
Ended

GOES-16

MISSION National Oceanic and Atmospheric Administration (NOAA)
Launched 2016-11-19 Orbit Geostationary orbit; on-orbit storage at 104.7 degrees west Revisit 0.003472 d
Operational

GOES-17

MISSION National Oceanic and Atmospheric Administration (NOAA)
Launched 2018-03-01 Orbit Geostationary orbit, 35786 km; backup at 89.5 W per WMO Swath 18000 km Revisit 0.0035 d
Operational

GOES-18

MISSION National Oceanic and Atmospheric Administration (NOAA)
Launched 2022-03-01 Orbit Geostationary orbit; GOES West at 137.0 degrees west Revisit 0.003472 d
Operational

GOES-19

MISSION National Oceanic and Atmospheric Administration (NOAA)
Launched 2024-06-25 Orbit Geostationary orbit; GOES East at 75.2 degrees west Revisit 0.003472 d
Operational

Gokturk-1

MISSION Turkish Ministry Of National Defence
Launched 2016-12-05 Orbit Sun-synchronous LEO Swath 20 km Revisit 3 d
Operational

Gokturk-2

MISSION Turkish Ministry Of National Defence
Launched 2012-12-18 Orbit Sun-synchronous orbit, about 686 km
Extended operations

GOSAT (Greenhouse gases Observing Satellite / Ibuki)

MISSION Japan Aerospace Exploration Agency
Launched 2009-01-23 Orbit LEO SSO 666 km Swath 1000 km Revisit 3 d
Operational

GOSAT-2 (Greenhouse gases Observing Satellite 2 / Ibuki-2)

MISSION Japan Aerospace Exploration Agency
Launched 2018-10-29 Orbit LEO SSO 613 km Swath 1300 km Revisit 6 d
Operational

GOSAT-GW (IBUKI GW)

MISSION Japan Aerospace Exploration Agency
Launched 2025-06-29 Orbit Sun-synchronous orbit, 666 km altitude, 13:30 ascending equator crossing time Revisit 3 d
Commissioning

GPM Core Observatory

MISSION National Aeronautics and Space Administration
Launched 2014-02-27 Orbit Circular non-sun-synchronous low Earth orbit; 65 deg inclination; raised to about 442 km in November 2023 Swath 904 km
Extended operations

GRACE

MISSION National Aeronautics and Space Administration
Launched 2002-03-17 Orbit Twin near-polar low Earth orbiters separated by about 220 km
Ended

GRACE-FO

MISSION National Aeronautics and Space Administration
Launched 2018-05-22 Orbit Twin near-polar low Earth orbiters separated by about 220 km
Operational

HawkEye 360 constellation

MISSION HawkEye 360, Inc.
Launched 2018-12-03 Orbit Low Earth orbit; formation-flying clusters around 500 km, with FCC-authorized operational altitudes from 475 to 615 km for HE360 constellation operations
Operational

Helsing EU Sovereign Constellation

MISSION Loft Orbital
Planned launch "2026-01-0 Orbit LEO, TBD
Planned

Hera

MISSION European Space Agency
Launched 2024-10-07
Operational

Himawari-8

MISSION Japan Meteorological Agency
Launched 2014-10-07 Orbit Geostationary orbit, 140.7 E, 35786 km Revisit 0.0069 d
Operational

Himawari-9

MISSION Japan Meteorological Agency
Launched 2016-11-02 Orbit Geostationary orbit, 140.7 E, 35786 km
Operational

HISUI ISS deployment

MISSION Ministry of Economy, Trade and Industry
Launched "2019-12-0 Orbit ISS orbit, approximately 400 km altitude, 51.6 degree inclination, non-sun-synchronous
Extended operations

HJ-2B (Huan Jing-2B)

MISSION China Center for Resources Satellite Data and Application
Launched 2020-09-27 Orbit Sun-synchronous orbit, 650 km altitude, 10:30 descending equator crossing Revisit 31 d
Operational

Huan Jing-2A

MISSION China Center for Resources Satellite Data and Application
Launched 2020-09-27 Orbit Sun-synchronous orbit, 650 km altitude, 10:30 descending equator crossing Revisit 31 d
Operational

HY-1C

MISSION National Satellite Ocean Application Service
Launched 2018-09-07 Orbit Sun-synchronous orbit, 785 km altitude, 10:30 descending equator crossing Revisit 7 d
Operational

HY-1D

MISSION National Satellite Ocean Application Service
Launched 2020-06-11 Orbit Sun-synchronous orbit, approximately 798 km altitude, 13:30 ascending equator crossing
Operational

HY-2B

MISSION National Satellite Ocean Application Service
Launched 2018-10-25 Orbit Sun-synchronous orbit, 973 km altitude, 06:00 descending equator crossing time
Extended operations

HY-2C

MISSION National Satellite Ocean Application Service
Launched 2020-09-21 Orbit Drifting orbit, approximately 1336 km altitude, 66 degree inclination Revisit 10 d
Operational

HY-2D

MISSION National Satellite Ocean Application Service
Launched 2021-05-19 Orbit Drifting orbit, approximately 973 km altitude, 66 degree inclination Revisit 10 d
Operational

HydroGNSS (ESA Scout)

MISSION European Space Agency
Launched 2025-11-28 Orbit SSO 550 km 98-degree inclination
Commissioning

HySIS

MISSION Indian Space Research Organisation
Launched 2018-11-29 Orbit Sun-synchronous orbit around 630 km altitude, 10:34 descending equator crossing Swath 30 km Revisit 90 d
Operational

ICESat

MISSION National Aeronautics and Space Administration
Launched 2003-01-12 Orbit LEO, near-polar frozen orbit, 591 km, 94 degrees inclination Revisit 91 d
Ended

ICESat-2

MISSION National Aeronautics and Space Administration
Launched 2018-09-15 Orbit LEO, near-polar frozen orbit, 496 km, 92 degrees inclination Revisit 91 d
Extended operations

ICEYE SAR constellation

MISSION ICEYE
Launched 2018-01-12 Orbit Sun-synchronous orbit Swath 400 km
Operational

ICEYE-X1

MISSION ICEYE
Launched "2018-01-1 Orbit SSO, 494 x 506 km, 97.56 deg
Ended

IMECE

MISSION Tubitak Uzay
Launched 2023-04-15 Orbit Sun-synchronous orbit, about 680 km
Operational

INSAT-3DR

MISSION Indian Space Research Organisation
Launched 2016-09-08 Orbit Geostationary orbit, 74 E, 35786 km
Operational

INSAT-3DS

MISSION Indian Space Research Organisation
Launched 2024-02-17 Orbit Geostationary orbit, 82 E, 35786 km
Operational

Intuition-1

MISSION KP Labs
Launched 2023-11-11 Orbit SSO 535 km, 97.5 deg Swath 40 km
Operational

Jilin-1

MISSION Chang Guang Satellite Technology Co., Ltd.
Launched 2019-06-05 Orbit Sun-synchronous orbit, 528 km altitude, 10:30 ascending equator crossing time Swath 9.6 km
Operational

Kanopus-V

MISSION State Space Corporation Roscosmos
Launched 2012-07-22 Orbit Sun-synchronous orbit around 510 km altitude, 10:30 ascending equator crossing for listed operational units Revisit 5 d
Operational

KazEOSat-1

MISSION Kazakhstan Gharysh Sapary
Launched 2014-04-30 Orbit Sun-synchronous orbit, about 759 km, 98.5 deg inclination Swath 20 km
Extended operations

KazEOSat-2

MISSION Kazakhstan Gharysh Sapary
Launched 2014-06-19 Orbit 630 km sun-synchronous Swath 77 km
Operational

KazSTSAT

MISSION Ghalam
Launched 2018-12-03 Orbit 575 km sun-synchronous Swath 275 km
Operational

KhalifaSat

MISSION Mohammed Bin Rashid Space Centre
Launched 2018-10-29 Orbit 613 km sun-synchronous, 98.13 deg inclination Swath 12 km
Operational

KOMPSAT-2

MISSION Korea Aerospace Research Institute
Launched 2006-07-28 Orbit Sun-synchronous orbit, 685 km, 10:50 ascending equator crossing Swath 15 km Revisit 5.5 d
Ended

KOMPSAT-3

MISSION Korea Aerospace Research Institute
Launched 2012-05-17 Orbit Sun-synchronous LEO, 675-685 km, 98.1 deg inclination Swath 15 km Revisit 28 d
Extended operations

KOMPSAT-3A

MISSION Korea Aerospace Research Institute
Launched 2015-03-26 Orbit Sun-synchronous LEO, 528 km, 98.1-98.5 deg inclination, 13:30 LTAN Swath 12 km Revisit 28 d
Extended operations

KOMPSAT-5

MISSION Korea Aerospace Research Institute
Launched 2013-08-22 Orbit Sun-synchronous dawn-dusk orbit, nominal altitude 550 km Swath 100 km Revisit 28 d
Extended operations

LAGEOS-1 (Laser Geodynamics Satellite)

MISSION National Aeronautics and Space Administration
Launched 1976-05-04 Orbit Inclined non-sun-synchronous medium Earth orbit, about 5900 km altitude
Operational

Landsat 8

MISSION U.S. Geological Survey
Launched "2013-02-1 Orbit Sun-synchronous, 705 km, 98.2 degree inclination, 10:12 LTDN Swath 185 km Revisit 16 d
Extended operations

Landsat 9

MISSION U.S. Geological Survey
Launched "2021-09-2 Orbit Sun-synchronous, 705 km, 98.2 degree inclination, 10:12 LTDN, 16-day repeat solo / 8-day with Landsat 8 Swath 185 km Revisit 16 d
Operational

LAPAN-A1 (LAPAN-TUBSAT)

MISSION National Research and Innovation Agency (BRIN)
Launched 2007-01-10 Orbit SSO
Ended

LAPAN-A2 (LAPAN-ORARI)

MISSION National Research and Innovation Agency (BRIN)
Launched 2015-09-28 Orbit near-equatorial LEO Swath 80 km
Operational

LAPAN-A3 (LAPAN-IPB)

MISSION National Research and Innovation Agency (BRIN)
Launched 2016-06-22 Orbit SSO Swath 120 km Revisit 21 d
Operational

LOTUSat-1

MISSION Vietnam National Space Center
Orbit SSO ~500 km (planned) Swath 50 km
Planned

LOTUSat-2

MISSION Vietnam National Space Center
Orbit SSO ~500 km (planned) Swath 50 km
Planned

Maya-1

MISSION Dost Asti
Launched 2018-06-29 Orbit ISS-deployed LEO (~400 km, 51.6 deg inclination)
Ended

Maya-2

MISSION Philippine Space Agency
Launched 2021-02-20 Orbit ISS-deployed low Earth orbit
Ended

MBZ-SAT

MISSION Mohammed Bin Rashid Space Centre
Launched 2025-01-14 Orbit Low Earth orbit SSO, 500-550 km altitude
Operational

Megha-Tropiques

MISSION Indian Space Research Organisation
Launched 2011-10-12
Ended

MENUT

MISSION Open Cosmos
Launched "2023-01-0 Orbit SSO Swath 19.5 km
Operational

MERLIN (Methane Remote Sensing Lidar Mission)

MISSION Centre National d'Etudes Spatiales
Orbit LEO sun-synchronous
Planned

Meteor-M N2-3

MISSION Roshydromet
Launched 2023-06-27 Orbit Sun-synchronous orbit, 820 km altitude, 15:00 ascending equator crossing time
Degraded

Meteor-M N2-4

MISSION Roshydromet
Launched 2024-02-29 Orbit Sun-synchronous orbit, 820.7 km altitude, 09:00 descending equator crossing time
Operational

Meteosat Third Generation Sounder 1 (MTG-S1)

MISSION EUMETSAT
Launched 2025-07-01 Orbit Geostationary orbit, approximately 36000 km altitude
Commissioning

Meteosat-10

MISSION EUMETSAT
Launched 2012-07-05 Orbit Geostationary orbit, 35786 km, 0.0 E full-disk service Swath 18000 km Revisit 0.0104 d
Operational

Meteosat-11

MISSION EUMETSAT
Launched 2015-07-15 Orbit Geostationary orbit, 35786 km; 9.5 E full-disk backup and rapid-scan service Swath 18000 km Revisit 0.0035 d
Operational

Meteosat-12

MISSION EUMETSAT
Launched 2022-12-13 Orbit Geostationary orbit; prime 0 degree longitude Meteosat service Revisit 0.006944 d
Operational

MetOp-A

MISSION EUMETSAT
Launched 2006-10-19
Ended

MetOp-B

MISSION EUMETSAT
Launched 2012-09-17
Operational

MetOp-C

MISSION EUMETSAT
Launched 2018-11-07
Operational

Metop-SG-A1

MISSION EUMETSAT
Launched 2025-08-13 Orbit Sun-synchronous orbit, 835 km, 09:30 descending equator crossing
Commissioning

MicroCarb

MISSION Centre National d'Etudes Spatiales
Launched 2025-07-26 Orbit Circular sun-synchronous orbit, 650 km altitude Revisit 25 d
Operational

MicroDragon

MISSION Vietnam National Space Center
Launched 2019-01-18 Orbit Sun-synchronous orbit; altitude varies across public summaries
Ended

MULA (Multispectral Unit for Land Assessment)

MISSION Philippine Space Agency
Planned launch 2027-04-01 Orbit Sun-synchronous low Earth orbit Swath 120 km
Planned

NanoDragon

MISSION Vietnam National Space Center
Launched 2021-11-09 Orbit Sun-synchronous orbit; public summaries cite about 560 km and 97.6 deg inclination
Ended

NanoMagSat

MISSION European Space Agency
Planned launch "2027-12-3 Orbit LEO 545 km, multi-inclination (60 deg x2 + polar x1)
Planned

NExSat-1

MISSION National Authority for Remote Sensing and Space Sciences
Launched 2024-02-03 Orbit 700 km sun-synchronous orbit Swath 30 km
Operational

NigeriaSat-1

MISSION National Space Research and Development Agency
Launched 2003-09-27 Orbit 675 x 694 km, 98.21 deg sun-synchronous LEO Swath 600 km Revisit 3 d
Ended

NigeriaSat-2

MISSION National Space Research and Development Agency
Launched 2011-08-17 Orbit 693 x 728 km, 98.26 deg sun-synchronous LEO Swath 300 km
Extended operations

NigeriaSat-X

MISSION National Space Research and Development Agency
Launched 2011-08-17 Orbit Sun-synchronous, about 700 km Swath 600 km
Extended operations

NISAR

MISSION Indian Space Research Organisation
Launched 2025-07-30 Orbit Sun-synchronous orbit, 747 km altitude, 98.4 degree inclination, 12-day exact repeat, 6 AM ascending / 6 PM descending Swath 242 km Revisit 6 d
Operational

NOAA-20

MISSION National Oceanic and Atmospheric Administration (NOAA)
Launched 2017-11-18 Orbit sun-synchronous
Operational

NOAA-21

MISSION National Oceanic and Atmospheric Administration (NOAA)
Launched 2022-11-10 Orbit sun-synchronous
Operational

NovaSAR-1

MISSION Surrey Satellite Technology Ltd
Launched 2018-09-16 Orbit Sun-synchronous, about 588 km Swath 750 km
Extended operations

Oceansat-3

MISSION Indian Space Research Organisation
Launched 2022-11-26 Orbit Sun-synchronous polar orbit, 723 km Swath 1800 km Revisit 2 d
Degraded

OCO-2 (Orbiting Carbon Observatory 2)

MISSION National Aeronautics and Space Administration
Launched 2014-07-02 Orbit SSO 705 km 98.2-degree inclination A-Train
Operational

OCO-3 (Orbiting Carbon Observatory 3)

MISSION National Aeronautics and Space Administration
Launched 2019-05-04 Orbit ISS orbit 408 km 51.6-degree inclination
Operational

PACE

MISSION National Aeronautics and Space Administration
Launched 2024-02-08 Orbit Sun-synchronous polar orbit; 676.5 km altitude; 98 deg inclination; 13:00 local equatorial crossing time Revisit 2 d
Operational

PakTES-1A (Pakistan Technology Evaluation Satellite-1A)

MISSION Space and Upper Atmosphere Research Commission
Launched 2018-07-09 Orbit Sun-synchronous, around 600-610 km
Extended operations

PAMI-1

MISSION Netherlands Ministry of Defence
Planned launch 2028-01-01
Planned

PAZ

MISSION
Launched 2018-02-22 Orbit Sun-synchronous TerraSAR-X orbit, about 514 km altitude, 97.44 deg inclination Swath 270 km
Operational

PeruSAT-1

MISSION Comision Nacional de Investigacion y Desarrollo Aeroespacial
Launched 2016-09-15 Orbit Sun-synchronous, ~700 km Swath 20 km
Operational

Pixxel Firefly-1

MISSION Pixxel
Launched "2025-01-1 Orbit Sun-synchronous, approximately 550 km, 97.65 degree inclination, 10:00-11:00 local solar time equator crossing Revisit 17 d
Operational

Pixxel Firefly-2

MISSION Pixxel
Launched "2025-01-1 Orbit Sun-synchronous, approximately 550 km, 97.65 degree inclination, 10:00-11:00 local solar time equator crossing Revisit 17 d
Operational

Pixxel Firefly-3

MISSION Pixxel
Launched "2025-01-1 Orbit Sun-synchronous, approximately 550 km, 97.65 degree inclination, 10:00-11:00 local solar time equator crossing Revisit 17 d
Operational

Pixxel Firefly-4

MISSION Pixxel
Launched "2025-08-2 Orbit Sun-synchronous, approximately 550 km, 97.65 degree inclination, 10:00-11:00 local solar time equator crossing Revisit 17 d
Operational

Pixxel Firefly-5

MISSION Pixxel
Launched "2025-08-2 Orbit Sun-synchronous, approximately 550 km, 97.65 degree inclination, 10:00-11:00 local solar time equator crossing Revisit 17 d
Operational

Pixxel Firefly-6

MISSION Pixxel
Launched "2025-08-2 Orbit Sun-synchronous, approximately 550 km, 97.65 degree inclination, 10:00-11:00 local solar time equator crossing Revisit 17 d
Operational

Pixxel Honeybee Zero (HB0)

MISSION Pixxel
Planned launch "2026-12-3 Orbit Sun-synchronous, approximately 500 to 550 km (TBD), 97.45 degree inclination (planned)
Planned

Planet Dove

MISSION Planet Labs PBC
Launched 2013-04-19 Orbit Sun-synchronous orbit; new flocks at about 525 km and 98 degrees inclination Swath 32.5 km Revisit 1 d
Operational

Planet SkySat

MISSION Planet Labs PBC
Launched 2013-11-21 Orbit Operational SkySat constellation includes morning and afternoon sun-synchronous satellites at about 475 km; first SkySat-1 operated at about 575 km Swath 5.73 km Revisit 0.1 d
Operational

Pléiades Neo 3

MISSION Airbus Defence and Space
Launched 2021-04-29 Orbit Sun-synchronous LEO, 620 km Swath 14 km Revisit 1 d
Operational

Pleiades-1A

MISSION Centre National d'Etudes Spatiales
Launched 2011-12-17 Orbit Sun-synchronous low Earth orbit, 694 km, 10:15 descending local solar time Swath 20 km Revisit 26 d
Operational

PRISMA

MISSION Agenzia Spaziale Italiana
Launched "2019-03-2 Orbit Sun-synchronous, 615 km, 97.85 deg inclination, 10:30 LTDN, 29-day nadir repeat Swath 30 km Revisit 29 d
Extended operations

PRSC-EO1 (Pakistan Remote Sensing Constellation - Earth Observation 1)

MISSION Space and Upper Atmosphere Research Commission
Launched 2025-01-17 Orbit Sun-synchronous
Operational

PRSC-EO2 (Pakistan Remote Sensing Constellation - Earth Observation 2)

MISSION Space and Upper Atmosphere Research Commission
Launched 2026-02-12 Orbit Sun-synchronous
Operational

PRSC-EO3 (Pakistan Remote Sensing Constellation - Earth Observation 3)

MISSION Space and Upper Atmosphere Research Commission
Launched 2026-04-25 Orbit Sun-synchronous
Operational

PRSS-1 (Pakistan Remote Sensing Satellite-1)

MISSION Space and Upper Atmosphere Research Commission
Launched 2018-07-09 Orbit Sun-synchronous, 700 km, 38.28 deg inclination
Operational

RADARSAT Constellation Mission

MISSION Canadian Space Agency
Launched 2019-06-12 Orbit SSO 586-615 km, 97.74 deg inclination Swath 500 km
Operational

RADARSAT-1

MISSION Canadian Space Agency
Launched 1995-11-04 Orbit Sun-synchronous, 798 km class, 98.6 deg inclination
Ended

RADARSAT-2

MISSION MDA Space
Launched 2007-12-14 Orbit SSO 798 km, 98.6 deg inclination Swath 530 km
Operational

RAMSES

MISSION European Space Agency
Planned launch 2028-04-01
Planned

RASAT

MISSION Tubitak Uzay
Launched 2011-08-17 Orbit SSO about 685 km Swath 30 km
Ended

Resourcesat-2

MISSION Indian Space Research Organisation
Launched 2011-04-20 Orbit Sun-synchronous polar orbit, about 817-822 km altitude, 98.7 degree inclination, 10:30 local time descending node Swath 740 km Revisit 5 d
Operational

Resourcesat-2A

MISSION Indian Space Research Organisation
Launched 2016-12-07 Orbit Sun-synchronous polar orbit, 817 km Swath 740 km Revisit 5 d
Operational

RISAT-2BR1

MISSION Indian Space Research Organisation
Launched 2019-12-11 Orbit Low Earth drifting orbit, 555-576 km altitude, 37 degree inclination Swath 50 km Revisit 5 d
Operational

RNLAF SAR-1

MISSION ICEYE
Orbit SSO (planned, altitude not publicly confirmed)
Planned

SAOCOM-1A

MISSION Comision Nacional de Actividades Espaciales (CONAE)
Launched 2018-10-08 Orbit Sun-synchronous orbit, 620 km altitude, 97.89 deg inclination Swath 350 km Revisit 16 d
Operational

SARah

MISSION Bundeswehr
Launched 2022-06-18 Orbit polar Earth orbit; public operator pages do not disclose detailed operational orbit for the full constellation
Degraded

Satellogic NewSat constellation

MISSION Satellogic
Launched 2016-05-30 Orbit Low Earth orbit, sun-synchronous operational constellation Swath 6.5 km Revisit 1 d
Operational

SaudiSat-3

MISSION King Abdulaziz City for Science and Technology
Launched 2007-04-17 Orbit Sun-synchronous LEO, approximately 655-678 km and 98.09 deg inclination
Operational

SaudiSat-5A

MISSION King Abdulaziz City for Science and Technology
Launched 2018-12-07 Orbit Sun-synchronous LEO, approximately 540 x 560 km and 97.6 deg inclination
Operational

SaudiSat-5B

MISSION King Abdulaziz City for Science and Technology
Launched 2018-12-07 Orbit Sun-synchronous LEO, approximately 540 x 560 km and 97.6 deg inclination
Operational

SCD-1

MISSION Instituto Nacional de Pesquisas Espaciais
Launched 1993-02-09 Orbit near-circular LEO, about 750 km altitude, 25 degree inclination
Operational

SCD-2

MISSION Instituto Nacional de Pesquisas Espaciais
Launched 1998-10-23 Orbit 742 km x 768 km LEO, 25 degree inclination
Operational

Sentinel-1A

MISSION European Space Agency
Launched "2014-04-0 Orbit Sun-synchronous, 693 km, 98.18 degree inclination Swath 250 km Revisit 6 d
Degraded

Sentinel-1C

MISSION European Space Agency
Launched "2024-12-0 Orbit Sun-synchronous, 693 km, polar, 18:00 LTDN (constellation design) Swath 250 km Revisit 12 d
Operational

Sentinel-1D

MISSION European Space Agency
Launched "2025-11-0 Orbit Sun-synchronous, 693 km, polar, 18:00 LTDN (constellation design) Swath 250 km Revisit 12 d
Operational

Sentinel-2A

MISSION European Space Agency
Launched "2015-06-2 Orbit SSO 786 km, 10:30 LTDN Swath 290 km Revisit 10 d
Extended operations

Sentinel-2B

MISSION European Space Agency
Launched 2017-03-07 Orbit SSO 786 km, 10:30 LTDN Swath 290 km Revisit 10 d
Extended operations

Sentinel-2C

MISSION European Space Agency
Launched 2024-09-05 Orbit SSO 786 km, 10:30 LTDN Swath 290 km Revisit 10 d
Operational

Sentinel-3A

MISSION European Space Agency
Launched 2016-02-16 Orbit Near-polar sun-synchronous orbit, 814.5 km reference altitude, 98.65 degree inclination, 10:00 descending node Swath 1270 km
Extended operations

Sentinel-3B

MISSION EUMETSAT
Launched 2018-04-25 Orbit Sun-synchronous orbit, 814.5 km altitude, 98.65 deg inclination, 10:00 descending node, 27-day repeat Revisit 1.8 d
Operational

Sentinel-5P (Precursor)

MISSION European Space Agency
Launched 2017-10-13 Orbit SSO 824 km 98.74-degree inclination LTAN 13:30h
Operational

Sentinel-6A Michael Freilich

MISSION EUMETSAT
Launched 2020-11-21 Orbit Non-sun-synchronous ocean-altimetry orbit, 1336 km altitude, 66 deg inclination, 10-day repeat Revisit 10 d
Operational

Sentinel-6B

MISSION EUMETSAT
Launched 2025-11-16 Orbit Non-sun-synchronous ocean-altimetry reference orbit, 1336 km altitude, 66.04 degree inclination, 9.9156-day repeat Revisit 9.9156 d
Commissioning

Sich-1

MISSION State Space Agency of Ukraine
Launched 1995-08-31 Orbit drifting LEO, about 650 km altitude, 82.5 degree inclination
Ended

Sich-2

MISSION State Space Agency of Ukraine
Launched 2011-08-17 Orbit Sun-synchronous LEO; CelesTrak current catalogue record lists approximately 666-684 km and 97.84 deg inclination, while Gunter reports 685 x 702 km and 98.26 deg from launch-era sources.
Ended

Sich-2-30

MISSION State Space Agency of Ukraine
Launched 2022-01-13 Orbit Sun-synchronous LEO; public catalogue sources report approximately 663-682 km operational altitude, and CelesTrak records decay on 2025-10-08. Swath 46.6 km
Ended

SMAP

MISSION National Aeronautics and Space Administration
Launched 2015-01-31 Orbit Sun-synchronous dawn/dusk, 685 km, LTAN 18:00, inclination 98 degrees, 8-day repeat, 98.5-minute period Swath 1000 km Revisit 3 d
Extended operations

SMOS

MISSION European Space Agency
Launched 2009-11-02 Orbit Sun-synchronous dusk-dawn, 758 km mean altitude, inclination 98.44 degrees, LTAN 06:00, 23-day repeat cycle, 3-day sub-cycle, 100.1-minute period Swath 1050 km Revisit 3 d
Extended operations

Spire Lemur-2

MISSION Spire Global
Orbit Low Earth orbit; WMO OSCAR reports 400-600 km variable orbit heights by launch opportunity, with the Lemur-2 satellite record listing a 550 km sun-synchronous representative orbit.
Operational

SPOT 6

MISSION Airbus Defence and Space
Launched 2012-09-09 Orbit Sun-synchronous LEO, 695 km, 10:30 descending equator crossing time Swath 60 km Revisit 1 d
Extended operations

STS-64 (Space Shuttle Discovery)

MISSION National Aeronautics and Space Administration
Launched 1994-09-09
Ended

STS-72 (Space Shuttle Endeavour)

MISSION National Aeronautics and Space Administration
Launched 1996-01-11 Orbit LEO, 296 km, 28.45 degrees inclination
Ended

STS-85 (Space Shuttle Discovery)

MISSION National Aeronautics and Space Administration
Launched 1997-08-07 Orbit LEO, 278 km, 51.6 degrees inclination
Ended

SumbandilaSat

MISSION South African National Space Agency
Launched 2009-09-17 Orbit Sun-synchronous LEO; Gunter reports 490 x 503 km and 97.37 deg at launch-era orbit, while CelesTrak records atmospheric decay on 2021-12-10. Swath 45 km
Ended

Suomi NPP

MISSION National Oceanic and Atmospheric Administration (NOAA)
Launched 2011-10-28 Orbit sun-synchronous
Extended operations

SuperView / GaoJing constellation

MISSION Beijing Space View Technology Co., Ltd. (SpaceWill)
Launched 2016-12-26 Orbit Sun-synchronous low Earth orbit, about 500-530 km altitude Swath 12 km Revisit 1 d
Operational

Surface Water and Ocean Topography (SWOT)

MISSION National Aeronautics and Space Administration
Launched 2022-12-16 Orbit Non-sun-synchronous drifting orbit, 891 km altitude, 78 deg inclination, 21-day repeat Swath 120 km Revisit 11 d
Operational

Swarm

MISSION European Space Agency
Launched 2013-11-22 Orbit High-inclination drifting LEO; two spacecraft began near 460 km with natural decay toward 300 km, and the third began near 530 km.
Extended operations

Synspective StriX

MISSION Synspective
Launched 2020-12-15 Orbit Sun-synchronous or inclined low Earth orbit; first StriX at 500 km, later StriX-1 and StriX-beta at 561 km SSO Swath 30 km Revisit 1 d
Operational

Tanager-1

MISSION Carbon Mapper
Launched 2024-08-16 Orbit LEO sun-synchronous orbit Swath 24.2 km
Operational

TechDemoSat-1 (TDS-1)

MISSION Surrey Satellite Technology Ltd
Launched 2014-07-08 Orbit LEO SSO 635 km
Ended

Terra

MISSION National Aeronautics and Space Administration
Launched "1999-12-1 Orbit Sun-synchronous, 705 km nominal (drifted to about 693 km since October 2022), 98.5 degree inclination, originally 10:30 AM LTDN now drifted to about 9:06 AM as of December 2025 Swath 2330 km Revisit 1 d
Degraded

TerraSAR-X

MISSION Deutsches Zentrum fuer Luft- und Raumfahrt
Launched 2007-06-15 Orbit Sun-synchronous near-polar orbit, 514-515 km Swath 100 km Revisit 11 d
Extended operations

THEOS-1

MISSION Geo-Informatics and Space Technology Development Agency
Launched 2008-10-01 Orbit SSO/LEO ~822 km, ~98 deg inclination Swath 22 km
Operational

THEOS-2

MISSION Geo-Informatics and Space Technology Development Agency
Launched 2023-10-09 Orbit Sun-synchronous low Earth orbit
Operational

TopSat

MISSION UK Space Agency
Launched 2005-10-27 Orbit Sun-synchronous LEO ~682-707 km, 98.18 deg inclination Swath 25 km
Ended

TRITON (FORMOSAT-7R)

MISSION Taiwan Space Agency
Launched 2023-10-09 Orbit Sun-synchronous low Earth orbit
Operational

UK-DMC

MISSION Dmc International Imaging
Launched 2003-09-27 Orbit Sun-synchronous low Earth orbit, about 676-695 km Swath 640 km
Ended

UK-DMC 2

MISSION Dmc International Imaging
Launched 2009-07-29 Orbit Sun-synchronous low Earth orbit Swath 660 km
Ended

Umbra SAR constellation

MISSION Umbra
Launched 2021-06-30 Orbit Commercial X-band SAR constellation; WMO lists operational satellites in low Earth orbit Revisit 7 d
Operational

VENµS (Vegetation and Environment monitoring on a New MicroSatellite)

MISSION Israel Space Agency
Launched 2017-08-02 Orbit Sun-synchronous, 720 km, 2-day repeat Swath 28 km Revisit 2 d
Extended operations

VIREON-1

MISSION AAC Clyde Space
Launched "2026-03-3 Orbit SSO 500 km Swath 15 km
Operational

VIREON-2

MISSION AAC Clyde Space
Launched "2026-03-3 Orbit SSO 500 km Swath 15 km
Operational

VNREDSat-1

MISSION Vietnam National Space Center
Launched 2013-05-07 Orbit SSO Swath 17.5 km Revisit 3 d
Operational

VRSS-1 (Miranda)

MISSION Agencia Bolivariana para Actividades Espaciales
Launched 2012-09-29 Orbit Sun-synchronous orbit, 645 km, 10:30 descending ECT
Ended

VRSS-2 (Sucre)

MISSION Agencia Bolivariana para Actividades Espaciales
Launched 2017-10-09 Orbit Sun-synchronous LEO; CelesTrak 612 x 639 km, 97.65 deg as of 2026-06-21 Swath 30 km Revisit 101 d
Operational

WorldView Legion

MISSION Vantor
Launched "2024-05-0 Orbit Mid-inclination, approximately 450 km, 93-min period (orbital-mechanics consistent) Swath 9 km Revisit 0.07 d
Operational

WorldView-1

MISSION Vantor
Launched "2007-09-1 Orbit Sun-synchronous, 499 km, 97.87 deg inclination, 13:30 LTDN (since June 2016) Swath 17.9 km Revisit 1.7 d
Extended operations

WorldView-2

MISSION Vantor
Launched "2009-10-0 Orbit Sun-synchronous, 770 km, 97.8 deg inclination, 10:30 LTDN Swath 16.4 km Revisit 1.1 d
Extended operations

WorldView-3

MISSION Vantor
Launched "2014-08-1 Orbit Sun-synchronous, 617 km, 97.97 deg inclination, 13:30 LTDN, 97-min period Swath 13.1 km Revisit 1 d
Extended operations

WSF-M1

MISSION United States Space Force
Launched 2024-04-11 Orbit Sun-synchronous orbit, 854 km altitude, 06:00 descending equator crossing time
Operational

YAM-3

MISSION Loft Orbital
Launched "2021-06-3 Orbit LEO, Falcon 9 Transporter-2 rideshare
Operational

YAM-5

MISSION Loft Orbital
Launched "2023-01-0 Orbit LEO, Falcon 9 Transporter-6 rideshare
Operational

YAM-6

MISSION Loft Orbital
Launched "2024-03-0 Orbit SSO, Falcon 9 Transporter-10 rideshare, Vandenberg SLC-4E
Operational

ZACube-1

MISSION Cape Peninsula University of Technology
Launched 2013-11-21 Orbit LEO; CelesTrak 535 x 592 km, 97.81 deg as of 2026-06-21
Operational

ZACube-2

MISSION Cape Peninsula University of Technology
Launched 2018-12-27 Orbit Decayed LEO/SSO; CelesTrak records impact/decay on 2024-04-24
Ended

Zhuhai-1 OHS

MISSION Zhuhai Orbita Aerospace Technology Co., Ltd.
Launched 2018-04-26 Orbit Sun-synchronous orbit, about 500 km altitude, 97 degree inclination for OHS-01/02 launch batch Swath 150 km
Operational

ZY-3 02

MISSION China National Space Administration
Launched 2016-05-30 Orbit SSO, 505 km
Operational

ZY-3 03

MISSION China National Space Administration
Launched 2020-07-25 Orbit SSO, 505 km
Operational

ZY-3 04

MISSION China National Space Administration
Launched 2025-12-16 Orbit SSO, 505 km
Operational